Hickey & Young Electrical carries out three phase fuse board installation in Clitheroe for farms, workshops, businesses and larger homes. We install, upgrade and test three phase boards to current regulations.
Most homes have a single phase supply. A three phase supply has three live conductors, which gives far more power. It is common on farms, in factories and business units, and in larger homes with heat pumps, several EV chargers or heavy machinery.
More Information
A three phase board has to spread circuits evenly across the three phases. If one phase carries too much, it can trip or overheat. We plan the board layout and balance the load so each phase does its fair share and the supply runs smoothly day to day.
Older three phase boards may use outdated fuses, lack RCD protection or have no spare ways for new circuits. We replace them with modern boards that offer better protection and room to grow. We test each circuit before and after, then provide a certificate.
Hickey & Young Electrical has 17 years of experience with domestic, commercial and industrial electrics. We install three phase boards for heat pumps, EV chargers, workshops and machinery around Clitheroe. Our team holds 18th Edition, 2391 Inspection and Testing and Gold Card qualifications. We explain what your supply can handle and give you a free quote.
17 years as electricians in the Ribble Valley
18th Edition and 2391 Inspection and Testing qualified
Gold Card, IPAF and BPEC certified
Free, no-obligation quotes on every job
Emergency electrician service available
STILL NOT SURE?
Most homes do not. You may need one if you plan to run large heat pumps, several fast EV chargers or heavy machinery. Workshops and farms often already have it. We look at what you want to run and tell you whether a single or three phase supply is the better fit.
Yes, but the new supply itself is installed by the local network operator, Electricity North West. We can help with the application and install the three phase board and wiring on your side. The network operator's timescale can vary, so it is best to start the process early.
Replacing a three phase distribution board usually takes a day, depending on the number of circuits. The power is off during the work, so we can plan it for a quieter time for businesses. New installs with extra circuits take longer. We give you a clear timescale when we quote.


t: 07359 734809
Mon: 7am - 5pm
Tue: 7am - 5pm
Wed: 7am - 5pm
Thu: 7am - 5pm
Fri: 7am - 5pm
Sat: 9am - 2pm
Sun: Closed
© Copyright 2026. Hickey & Young Electrical. All rights reserved.
Address: 22 Siddows Avenue, Clitheroe, BB7 2NX